Work is underway to install a pile field in the house №1 - readiness 97%. The planned supply of reinforced concrete structures for the installation of the main pile field is underway. Laboratory tests with static load on piles under investigation for the house №2 have been completed. The soil of the parking lot is being developed - 20% readiness.